Export cable hang-off test


Vos Prodect Innovations is happy to announce the completion of a new test on the permanent section of the cable hang-off system.
With the latest test, our main aim was to determine the maximum axial cable
 load that the permanent hang-off part can withstand.

We have used a 3x630mm² submarine cable, which was secured at the permanent hang-off by means of clamping on the armour wires. We
have reached a pulling force up to 200kN without any sliding of the cable armour wires. Since, the chinese finger used for pulling on the cable was not able to withstand greater pulling forces, we had to stop the test.
Although the maximum load could not be determined by this test, the results are very satisfying as 200kN leaves enough safety margin in order to cope with the export cables, used for the offshore wind farms. "This means we can now take another step closer to bringing the export cable hang-off to our valued customers".

Being an independant designer and developer of inter-array cable hang-off systems, we have maintained our market leading position by achieving a delivery volume of more than 900 systems over the last 2 years.
Our engineering team have built up significant expertise and experience in terms of coping with different and challenging requirements. Each project delivery has allowed us to make some valuable contributions in all of our projects up to date, which helps improving system optimization, installation efficiency and overcoming engineering challenges.