Pitures of our visit to the Baltic-1 windfarm
Wind turbines at Baltic-1
Transformer station
Preparing for rotor installation

Transition piece at tower B13
Cable laying Vessel between Baltic-1 and Rostock harbor
The rotors on the Sea Power, ready for installation



